GOALS
Install a photovoltaic system on an existing parking structure to supplement a larger overall campus wide renewable energy project.
SYSTEM SIZE
338.26 kW
SYSTEM PRODUCTION
537,000 kWh (Annually)
UTILITY DISTRICT
San Diego Gas & Electric
COMPLETED
November 2008
AVOIDED EMISSIONS (Annually)
Carbon Dioxide (lbs): 916,960
Gallons of Gasoline: 47,464
Barrels of Oil: 972
Vehicles Removed: 76
Homes Powered: 45
FOREST PRESERVED (Annually)
Acres: 2.9
|